Sync: Labs-FinTecAI Project Doc Audit Closeout

  • 日期:2026-05-14
  • Owner:Labs-FinTecAI Admin
  • Lane:knowledge-refactor
  • 批次:Batch 8C-5
  • 状态:Completed for audit closeout; rewrite remains pending / accepted-deferred

1. Closeout 边界

Batch 8C-5 关闭的是五个项目对象的首轮文档体系 audit 汇总,不关闭项目正文重构。

本 closeout 证明:

  1. Data Horizon、FinClaw、AI Trading Matrix、RLE、FEFM 均已有项目层 canonical / support / evidence / open-gap 角色清单;
  2. 项目层文档体系的问题已从“是否做过 audit”推进为“谁被授权重写、哪些文件需要 rewrite packet、哪些 readiness 项 accepted-deferred”;
  3. FR-003、FR-004、FR-014、FR-015、FR-016、FR-017 的项目层缺口已经落到五个项目对象上。

本 closeout 不证明:

  1. projects/* 项目正文已经完成重写;
  2. Data Horizon、FinClaw、AI Trading Matrix 已有完整工程 / trial / eval closeout;
  3. RLE / FEFM 已正式启动、训练、微调、服务化或产生运行证据;
  4. Admin 已获得统一重写各 Controller 项目正文的授权。

2. 项目 Audit 汇总

项目Audit packetCanonical docsSupport docsEvidence docsOpen gaps重写建议
Data Horizonpackets/sync/labs-fintecai-data-horizon-project-doc-audit-2026-05-14.mdprojects/data-horizon/README.md 为 public entry;projects/data-horizon/project-anchor.md 为 project anchor。inherited-context.mdcurrent-state.mdoutput-object-inventory.mdcurrent-practice-profile.mdpackets/sync/data-horizon-alignment-packet-2026-05-12.md缺运行证据、commit / branch / startup / db / real source / API / UI / sample outputs、reference eval、product definition / CONTEXT 启动条件、schema / sample / journey / state / eval / evidence path。Controller-owned rewrite plan;Admin 不在 Batch 8D 前统一重写项目正文。
FinClawpackets/sync/labs-fintecai-finclaw-project-doc-audit-2026-05-14.mdprojects/finclaw/strategic-whitepaper.mdproduct-definition.mdmvp-product-definition.mddesign/foundation/product-object-and-advisor-design.mddesign/foundation/terminology-and-object-naming.mddesign/v1/v1-design-kickoff-packet.mddesign/v1/v1-prd.mddesign/v1/v1-collaboration-and-task-packet-plan.md、task packets。projects/finclaw/reference-experience/README.md、reference experience / evaluation reports。缺完整 Design Packet、User Journey、Product Object and Schema Design、UI / UX Interaction Design、Agent Orchestration Design、Evaluation and Trial Acceptance Plan、Trial Operations Plan、API / persistence contracts、真实 trial data、reader testing、量化指标、时间盒、kill criteria、JSON samples、state-machine、runnable closeout evidence。Controller-owned rewrite plan;可在 Batch 8D 决定是否授权 Admin rewrite-lite 精确文件。
AI Trading Matrixpackets/sync/labs-fintecai-trading-matrix-project-doc-audit-2026-05-14.mdprojects/trading-matrix/project-anchor.mdinherited-context.mdcurrent-state.mdcurrent-practice-profile.mdreferences/trading-matrix/README.md、NOFX evaluation plan / evaluation、external candidate scan、packets/sync/trading-matrix-context-entry-cleanup-2026-05-13.md缺 product definition / MVP / PRD、execution governance、risk policy、end-to-end run evidence、NOFX deep gap evaluation、external candidate pool、authorization / audit / permissions security gaps、JSON samples、user journey、state machine、acceptance cases、UI risk state。Controller-owned rewrite plan with Admin governance guardrails;Batch 8D 前不直接重写正文。
RLEpackets/sync/labs-fintecai-rle-fefm-project-doc-audit-2026-05-14.mdprojects/reinforcement-learning-engine/project-anchor.mdinherited-context.mdcurrent-state.md暂无项目运行证据;当前只有 readiness planning evidence 和 controller state。缺 readiness checklist、真实 upstream feedback samples、本地 repo / prototype / scripts / dataset / run evidence、Feedback Event / Outcome / Error Case / Evaluation Sample / Learning Asset schema、feedback governance rules、RLE -> FEFM 边界。accepted-deferred / Controller-owned readiness plan;不应由 Admin 直接写 product definition。
FEFMpackets/sync/labs-fintecai-rle-fefm-project-doc-audit-2026-05-14.mdprojects/financial-expert-foundation-model/project-anchor.mdinherited-context.mdcurrent-state.md暂无项目运行证据;当前只有 readiness planning evidence 和 controller state。缺 capability agenda、与 general LLM / existing models 关系、evaluation sample governance、Learning Asset input boundary、frontend system feedback validation scenarios、本地 repo / model / experiments / datasets / training config / run evidence。accepted-deferred / Controller-owned readiness plan;不应由 Admin 直接启动模型正文或训练承诺。

3. 目标状态更新

验收目标Batch 8C-5 后状态说明
各项目层所有文档 / 文档体系 / 文档内容完成重构优化Audit complete / rewrite pending + accepted-deferred五个项目对象 audit 完成;Data Horizon / FinClaw / AI Trading Matrix 进入 rewrite authorization / rewrite packet;RLE / FEFM 进入 readiness-gated accepted-deferred。
各 Controller 的项目正文已经由 Admin 统一重写完成Not satisfied / authorization requiredBatch 8C-5 不改变治理边界;是否由 Admin 统一重写必须进入 Batch 8D。
团队反馈问题及根因逐条解决Partially addressed项目层缺口已经映射到 FR-003、FR-004、FR-014、FR-015、FR-016、FR-017;仍需 Batch 8D / 8E 转成授权、rewrite packet、readiness packet 或 blocked-with-owner。

4. Batch 8D 输入

Batch 8D 必须选择并记录一条主路径:

路径含义适用项目
路径 A:Admin precise rewrite authorization用户明确授权 Admin 对精确列明的 project-body files 做统一重写。只能用于本 closeout 明确列出的文件,不得泛化为 projects/* 全量改写。
路径 B:Controller-owned rewrite plan接受项目正文继续由对应 Controller 重写,Admin 只维护边界、入口、验收矩阵和公共路由。Data Horizon、FinClaw、AI Trading Matrix 的默认路径;RLE / FEFM 的 readiness-gated 默认路径。
路径 C:Blocked-with-owner缺少授权、证据、owner 或项目启动条件,不能执行正文重写。任何没有明确 owner / evidence / authorization 的项目正文。

5. 恢复指令

下一自然批次为 Batch 8D Admin Rewrite Authorization

恢复时先读:

  1. controllers/labs-fintecai-admin/state.md
  2. packets/sync/labs-fintecai-project-doc-audit-closeout-2026-05-14.md
  3. packets/sync/labs-fintecai-knowledge-refactor-acceptance-matrix-2026-05-14.md
  4. packets/sync/labs-fintecai-feedback-root-cause-register-2026-05-14.md

不得从 Batch 8C-5 直接跳到项目正文重写,除非 Batch 8D 明确记录授权、文件清单、owner、验收标准和 rollback / deferral 边界。