跳到主要内容

Data Horizon 第一阶段文档产出清单

1. 原则

  • canonical 产品决定留在知识治理库;
  • code、tests、runtime logs 和 daily status 留在工程仓;
  • 生产验收以独立 evidence/receipt 记录,不用文档措辞替代;
  • for-agents/** 只由 derive 生成;
  • 已有实现可以登记为 evidence,不能自动升级为产品定义;
  • 第一阶段已于 2026-08-31 按 Phase 1 Closure 口径收束完成(收束判定 PASS;四轴历史状态 Governance Partial / Implementation Substantial / Production Partial / Acceptance Not accepted 保留为历史事实)。本清单自此作为第一阶段产出历史索引维护,不改写既有状态;第二阶段已提议、未启动,其知识包见 第二阶段知识包

2. 本轮 canonical rebaseline

DeliverableStatusLocation
L2 rebaseline proposalAccepted / canonical baseline activegovernance/proposals/accepted/2026/2026-08-21--data-horizon-canonical-rebaseline.md
2026-08 current-practice fact mapDrafted / verified locallyFact map
Output/interface/architecture/collaboration inventoriesDrafted / verified locallyInventories
External reference evaluationCompleted for current decision setReference evaluation
Owner direction register D-01..D-14D-01..D-13 Accepted;D-14 DeferredOwner directions
Engineering delta evidence 3e0bb402..65fde06dReviewed / local tests passed / production not inferredFact map baseline
L2 reviewer evidence packetDraft / not a review receiptReview evidence packet
DH ↔ TM information-quality / feedback-boundary proposalL3 Accepted / active canonical alignedgovernance/proposals/accepted/2026/2026-08-25--dh-tm-information-quality-and-feedback-boundary.md
Strategic whitepaper rebaselineDrafted / verified locallyWhitepaper
System/product definitionDrafted / verified locallyDefinition
Previous system/product definitionArchived_archive/projects/data-horizon/2026-08-21-canonical-rebaseline/system-product-definition-2026-06-01.md
Gap MapDrafted / verified locallyGap Map
Roadmap/work-package indexDrafted / verified locallyRoadmap
P4 architecture candidate decision packet未随本发布公开(deferred future decision)无链接;Owner 决策前不作为 active 输入

Drafted / verified locally 表示 Markdown/schema/link checks 已通过,不表示治理提议已合并或站点已发布。

3. Gate A deliverables

当前 CPI slice 状态:DH-IH-01 charter、本地 workflow evidence、scoped deployment 与首次正常 schedule sync/readback receipt 登记在 DH-IH-01 CPI trial evidence。DH-IH-01 为 Implementation=Implemented / Production=Partial / Acceptance=Local only。P2/P3 trial-local 探索仅作为历史工程事实保留,未获 accepted proposal 批准,不登记为 canonical deliverable、治理状态或 roadmap completion claim。这些产物均不是 independent closure receipt、真实 consumer acceptance 或 Gate C portability receipt。

DeliverableTriggerMinimum content
IH trial charter选择受控信息域users/tasks/scope/rights/sample/timebox/stop conditions
IH workflow evidenceTrial 运行后source/review/retrieval/recovery actions + audit evidence
Lifecycle fixture/replay packidentity trial 启动original/corrected/withdrawn/superseded/replayed cases
Operations evidence registerTrial 前release/migration/job/cost/acceptance evidence references
Independent closure receiptTrial 完成result, failures, residuals, owner acceptance

4. Gate B deliverables

DeliverableTriggerMinimum content
Object comparisonCurrent shapes challengedidentity/lifecycle/provenance/rights/quality/反事实 deletion test(仅用于架构分类,不授权删除或停用现有 runtime)
Interface comparisonMachine tasks knownquery/feed/bulk/event options, compatibility, cost, risks
Rights inventorySource/output trial chosensource→asset→output→purpose/consumer evidence
Macro semantic fixtureMacro remains in slicerelease/reference period/observation/vintage/revision cases
Candidate decision packetReference evidence completerecommended option + alternatives + no-schema boundary
TM compatibility manifest + regression receipt任何变更触及现有 TM seamroutes/payloads/versions/scopes/authz/data semantics/feedback/direct push/jobs/readback/deprecation/rollback

5. Gate C deliverables

DeliverableTriggerMinimum content
Existing News v1 compatibility acceptance receiptSeparate activation authorizationdeploy/index/wait=0/50 items or 60 min result;customer identity stays outside canonical
Heterogeneous B pilot charterGate A/B readydifferent workload, rights, SLA, exit, portability metrics
B contract readiness packetTwo workloads completeversioning/metering/deprecation/support/rights/cost evidence

6. Control-plane deliverables

DeliverablePurpose
Configuration concurrency decisionpatch/replace/command/revision/conditional write/rollback
Scheduler scope decisionscraper-only vs broader catalog; overlap/restart/rollback
Migration history proposalidentity/order/checksum/lock/history/preflight/readback
Production action runbookexact target, preflight, stop conditions, rollback, readback, authorization

7. Existing work-package documents

DH-WP-001 与 DH-WP-002 的字段字典、设计稿、prototype 和反馈模板按 current compatibility 与 historical archive 分层保存,不复制到新 canonical 对象定义。

8. 当前不产出

  • 正式 Perception Record / Feed / Evidence / Dataset schema;
  • 完整外部 API/SDK/MCP 规范;
  • DH external-C PRD;
  • 年度 feature roadmap;
  • 未经过 reference evaluation 的技术架构重写;
  • 把生产日志、密钥、配置值或个人数据复制进治理库。

Changelog / 演化记录

2026-08-31:登记第一阶段收束完成(判定 PASS);本清单改为第一阶段产出历史索引,既有产物状态不改写;新增第二阶段知识包指针。

2026-08-27:工程增量证据刷新至 3e0bb402..65fde06d;P2/P3 trial-local 探索从 active deliverables 状态移除,仅保留未获治理批准的历史事实说明;P4 candidate decision packet 未获 accepted proposal 批准,P4 相关正式对象/Feed/lifecycle storage 决策保留为 deferred future decision(不含链接);登记 Phase 1 Closure 执行读法。

2026-08-25:登记 DH-IH-01 CPI trial charter、11 项本地 acceptance checks、scoped deployment 与首次正常 schedule sync/readback receipt;FRED/BLS identity 与 acquisition time 已闭合,因受管 raw artifact、正式 observation vintage 与真实 review/recovery operator evidence 未闭合,未生成 Independent closure receipt。

2026-08-25:登记工程增量事实复核与 L2 reviewer evidence packet;明确 evidence packet 不是人工 review receipt,当前 HEAD 的本地验证也不是生产部署或验收证据。

2026-08-21:重建 deliverables registry,登记 canonical rebaseline、Gate A/B/C 与 control-plane 产物,区分本地校验、治理接受、生产证据和业务验收;旧 WP-001 单线 S0/S1/S2 文档流降为历史实践证据。